Checkpoint· ~8 min
Dry-Run the Intent
Intents written against TS 28.312 and the feasibility reports that come back. Find what makes an intent invalid, read a pre-evaluation report as its consumer, and choose what to do next before anything reaches the network.
Loading the lab