Skip to content
5G/6G AcademyEst. 2009
Back to Log Analysis Labs
Log Lab advanced 35 min4 graded questions

Core Overload — AMF During Super Bowl Surge

Super Bowl LX kickoff triggered a mass-reconnect herd at MetLife Stadium. The AMF started rejecting registrations. Find what ACTUALLY overloaded — and why scaling the AMF alone didn't help.

Scenario
It's Super Bowl LX — MetLife Stadium. Attendance 82,500. At kickoff (18:30 local), AMF-US-EAST-3 started showing degraded performance. Customer complaints of registration failures are pouring in. You pulled 45 minutes of AMF logs spanning pre-kickoff through crisis. Your task: answer (a) what overloaded, (b) why, (c) what should be done differently next big event. Useful filters: `severity:ERROR,CRITICAL`, `component:SBI`, `time:18:30-18:45`.

Run this lab free for 7 days

Engineer-grade log labs, gNB/5GC trace analysis and TelcoMentor assistance are included with 5G/6G Academy Prime Membership. Join free and every lab opens for 7 days — no card.

Join for free

Already have an account? Log in